How it works
The batch record is built during the batch, not after it.
Zenblock Labs lets authorized teams record and manage information as work happens across Raw Material, Dispensing, Manufacturing, Packaging, QC and Release. Select a stage to see what is captured there.
Captured at this stage
Manufacturing
Authorized teams record information as the work happens, so the batch record is built during the stage rather than reconstructed afterwards.
- Process parameters by stage
- Equipment and cleaning records
- In-process control results
- Deviations raised during the process

Controlled workflows
Rules that hold, not reports that describe.
Where configured, critical quality controls can prevent a batch from progressing until the required condition is satisfied. Rejected material cannot be selected for dispensing, an IPC failure requires a deviation before progression, expired balance calibration blocks weighing, label reconciliation that is not zero blocks the packaging and release gate, incomplete training blocks sign-off, and an open blocking deviation blocks batch release.
Configured controls can enforce defined quality and workflow rules. Not every regulatory requirement is automatically enforced.
Deployment
Your manufacturing data stays under your control.
Private or on-premise deployment is the primary option, so your data never leaves your control and is never on a shared platform with other CMOs. Private cloud is also available where the customer prefers it, and deployment architecture is designed around the CMO's IT, security and data-governance requirements.
Free pilot
Start with one batch.
A pilot focuses on a defined batch lifecycle and expands from there once the value is visible to your quality and production teams.
- 01
Select a product or batch
Choose one defined batch lifecycle to begin with, not the whole organization.
- 02
Map the current process
Document how the batch runs today across departments, records and hand-offs.
- 03
Configure the digital workflow
Set up stages, records and the quality controls that should gate progression.
- 04
Run the batch through Zenblock Labs
Teams record information as the work happens, stage by stage.
- 05
Measure the difference
Review audit retrieval, process visibility and workflow improvements.
